Categories
Contact Us

Qingdao Senwang Steel Structre Building Stock Co.,Ltd

Add: No.860 Heilongjiang Road, Qingdao City, China

GeneralManager: Frank

Tel: 86-532-58731888

Mobile: 86-18605323898

FAX: 86-532-88833301

E-mail:  qdsw87@qdswsteel.cn

www.swsteelstructure.com

Service Hotline
+8618605323898
86-532-58731888
Low Price Steel Construction Building

Low Price Steel Construction Building

low price steel construction building Product Description Advantages 1. We have a group of professional engineers, most of whom has more than 10 years’ experiences in architecture field. 2. Established for more than ten years, our company has got a various of experiences in design, manufacture,...

Product Details

Basic parameters of low price steel structure

Product nameLow price steel structure building
Product categorySteel structure
Place of productionPlace of production
Steel typeq235b,q345b
BrandQingdao Senwang
Steel columnH-section steel
Steel beamH-section steel
Withstanding wind columnH-section steel
Roof Purline

cold formed galvanized C Section Steel

or Z Section Steel

 Wall purline

cold formed galvanized C Section Steel

or Z Section Steel

 End Wall purline

galvanized C Section Steel or Z Section Steel

Seismic gradeGrade 8
Wind resistance gradeGrade 12
Certification standardAISI, ASTM, BS, DIN, GB, JIS
CertificateISO9001:2008


Steel structure building.jpg


Advantages of steel construction

1. Advantages of economic and social benefits Foundation cost savings-when the bearing capacity of the foundation is low, because of the light self-weight, it may be possible to meet the requirements of the foundation bearing capacity of the building without treatment or proper treatment. Thus, the cost of foundation treatment and foundation cost can be saved.  

2. The construction period is short and the occupied site is small-because of the factory production of the main steel structure members, and then they arrive at the site to complete the assembly, it has a very obvious advantage to the site where the construction work surface is very narrow. The working surface needed for field processing is greatly reduced. The foundation construction, floor construction and steel member processing can be carried out in parallel or at the same time, thus greatly reducing the construction period of the site, compared with the construction period of the traditional concrete structure, can shorten about 1 / 4 / 1 / 3 of the construction period.  

3. The investment risk is small-because the construction period is short, thus shortens the fund turnover period, reduces the developer's overall cost, can evade or reduce because of the market abrupt change brings the unpredictable risk.  

4. Increase the utilization rate-because the steel structure column section size is small, compared with the concrete column, the section is smaller than 50%, and the open space dimension is flexible, this will increase the effective use area product of 6 or 8%, also can realize the internal space free division.

Welcome to know other related products

Application.jpgcontact us

Contact Us.jpg

Related Products
Feedback

The content of this website is contributed by the Internet user spontaneously, this website does not bear the related legal responsibility. If there is any suspected plagiarism report, we will delete the relevant content immediately.